Customization: | Available |
---|---|
Power Supply: | 380/220V |
Certification: | CE, ISO |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
2.1 Volume | About 80L |
2.2 Inner size | W 500 mm*H 400 mm*D 400 mm |
2.3 Outer size | W 700 mm*H 1735 mm*D 1200 mm(Not including the protruding part)) Tips: For external dimensions, please confirm the three views according to the final design! |
2.4 Floor area | About 0.9m2;(Confirm after signing the contract) |
3.1 Test Conditions | Equipment cooling method: air-cooled Measured at room temperature +25 ° C under no load, Temperature and humidity performance measurement comply with related regulation of IEC60068-3-5 standard; Sensors placed in the air outlet. |
3.2 Temp. range | -20ºC~+150ºC |
3.3 Temp Constancy | ±0.5ºC |
3.4 Temp Uniformity | <=2.0ºC |
3.5 Temp Deviation | <=±2.0ºC |
3.6 Heating and cooling rate | Heating rate: -20ºC~+150ºC, full range average 3ºC/min no load |
Cooling rate: +20ºC~-20ºC, full range average 1ºC/min No load |
|
3.7 Load situation | without |
3.8 Humidity range | 10~95%R.H |
3.10 Humidity deviation | ±3.0%RH(>75%RH) ±5.0%RH(≤75%RH) |
3.11 Humidity uniformity | ±3.0%RH(No-load) |
3.12 Humidity deviation | ±2.0%RH |
3.13 Noise | <=75 (dB) (The noise detection device is measured 1m away from the door of the device) |
3.14 Meet the test standard | GB-2423.1-2008(IEC68-2-1) Test A: Low Temperature Test GB-2423.2-2008(IEC68-2-2) Test B: High Temperature Test GJB360.8-2009(MIL-STD.202F) High Temperature Life Test GJBl50.3-2009(MIL-STD-810D) High Temperature Test GJBl50.4-2009(MIL-STD-810D) Low Temperature Test GB2423.3-2008(IEC68-2-3) Test Ca: Constant Heat Test GB2423.4-2008(IEC68-2-30) Test Db: Damp Heat Alternative Test GJBl50.9-2009(MIL-STD-810D) Damp Heat Test |
4.1 Structural features | Overall chamber structure The test chamber was composed of three parts as below: Insulation box, separate refrigeration units, and electrical control cabinet. |
4.2 Thermal insulation structure | Outer spray plastic anti-corrosion electrolysis plate - intermediate insulation layer is temperature resistant foam insulation material - inner chamber SUS304 stainless steel plate |
4.3 Outer chamber material | High-quality anti-corrosion electrolytic board, surface electrostatic powder baking paint, color is KOMEG standard color |
4.4 Inner chamber material | SUS304 stainless steel plate, thickness = 1.0 mm; the inner liner is fully welded. |
4.5 Insulation | Hard polyurethane foam insulation layer, thickness = 100mm, flame retardant grade B2 |
4.6 Door |
Single door (full size) left open, The door frame is equipped with two silicone rubber sealing strips and anti-condensation electric heating device to prevent external dew condensation; |
4.7 Observation window | There is an observation window on the door (according to the design) Multi-layer vacuum glass window with electronic defogging film for heat and sweat protection, and prevents condensation. |
4.8 Control panel | Temperature (wet) control touch screen display, start switch, emergency stop switch, buzzer |
4.9 Unit part | include:Refrigeration unit, drain pipe, cooling fan, power distribution control cabinet; Humidification and hydration waterway control system |
4.10 Distribution Cabinet | Switchboard ; Cooling fan Total power leakage circuit breaker |
4.11 Standard configuration |
One Testing Hole on each side with Diameter 50mm with silicone lid 2 Sample Holders, each capacity 30 Kgs 1 Observation Window Light 24VDC LED light, on/off controlled on controller. 4 moving Casters with fixing goblets on each |