Customization: | Available |
---|---|
After-sales Service: | 24 Hours on Line Services |
Power Supply: | 380V AC 50Hz |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High and Low Temperature 3-Zone Thermal Shock Testing Chamber is consists of High-temperature zone (Pre-heating area), Low-temperature zone (Pre-cooling area), and DUTs testing area (thermal shock testing zone). Adopting independent wind path valve switching mode to transfer hot air and cold air to test area; and make sure the high low temperature transferring swiftly, the test sample(DUTs) needn't move during the whole testing process. The test chamber is suitable for materials industry to examine the whole set of products, components, parts, and materials subjected to rapid changes between high and low-temperature conditions; and to evaluate the test samples' performance reliability when suffering the extreme temperature change due to thermal expansion and contraction caused by the changes of chemical or physical damage.
•GB-2423.1-2008(IEC68-2-1) Test A: Low Temperature Test
•GB-2423.2-2008(IEC68-2-2) Test B: High Temperature Test
•GJBl50.3-2009(MIL-STD-810D) High Temperature Test
•GJBl50.4-2009(MIL-STD-810D) Low Temperature Test
•GJBl50.5-2009 Temperature shock test method
Model | KTS-252 (Chamber volume 252L) | ||
KTS-252 A | KTS-252 B | KTS-252 D | |
Testing size W*H*D(mm) | 700*600*650mm | ||
Exterior size W*H*D(mm) | 1900*1905*1940mm | ||
Test weight(KG) | 10 | ||
High Temp.Chamber | +60ºC~+200ºC | ||
Pre-heating time | from normal temperature RT ~ +200ºC, Within 30 min | ||
Low Temp.Chamber | 0ºC~ -40ºC | 0ºC~ -55ºC | 0ºC~-70ºC |
Pre-cooling time | from normal temperature RT ~ -70° C Within 70 min | ||
Temp.Shock Range | -40ºC~+150ºC | -55ºC~+150ºC | -65ºC~+150ºC |
Temperature uniformity | <=±2.0ºC | ||
Temperature fluctuation | <=±0.5ºC | ||
Temperature deviation | ±2.0ºC | ||
Transfer time | <=5s | ||
Recovery time | <=5min | ||
Noise | <=75dB | ||
Interior material | Stainless steel plate(SUS 304) | ||
Exterior material | Baked painting steel or stainless steel(SUS304) | ||
Insulation material | Rigid polyurethane Foam + glass fiber wool | ||
Cooling method | Water Cooled | ||
Refrigeration system | Semi-hermetic compressor, cascade refrigeration system,Eco-friendly refrigerant | ||
Controller | Panel:KOMEG 7-inch Programmable *Operating system: KOMEG KM-5188 Cold-punching system cold output version |
||
Safety device | NFB(No fuse breaker), over pressure, over heat and over current protection for compressor, over temperature protection, over load protection for blower, dry heat protection,shortage water protector | ||
Standard accessory | Cable port(portΦ50mm)*1, Shelves*2 , Mobile Casters with foot cups*4 | ||
Environment Condition | 1.Ambient temperature: 5ºC-35ºC 2.Relative humidity: <=85%R.H 3.Atmospheric pressure:80kPa~106kPa 4.Flat, vibration-free ground; 5.Choose good ventilation, no direct sunlight or direct radiation from other heat sources; 6.There is no strong airflow around: when the surrounding air needs to flow, the airflow should not be blown directly onto the cabinet.; 7.No strong electromagnetic field around; 8.No high concentration of dust and corrosive substances around |
||
Power | AC 380±10% 50Hz ,3 phase 4 wires +Ground Wires | ||
Note: 1. We reserve the right to change specifications without prior notice 2. Customized sizes and configurations available |
Pre-sale Service:
Provide test solution
Send specification and quotation
24-hour Online contact
Free software upgrades
Replacement parts
Assistance via phone or internet
On-site diagnosis and repair/online diagnosis and repair
Q:Are your company a trading one or a factory?
A:Factory + trade (integration).More than 30 years focusing on environmental test instruments field.